A 120m train bridge designed to have minimal impact on the landscape, with the supporting structure all beneath the track level. Probably not feasible in the real world as a boat might come along, but fortunately one does not in the game.
Cost | $7873 |
Length | 120m |
Materials available | Iron, Cable |
No. Phases | 2 |
Budget | $20000 |
Level designed by | Chronic Logic |