A 120m train bridge designed to have minimal impact on the landscape, with the supporting structure all beneath the track level. Probably not feasible in the real world as a boat might come along, but fortunately one does not in the game.
| Cost | $7873 |
| Length | 120m |
| Materials available | Iron, Cable |
| No. Phases | 2 |
| Budget | $20000 |
| Level designed by | Chronic Logic |