Join or sign in):  

Hard 4

A 120m train bridge designed to have minimal impact on the landscape, with the supporting structure all beneath the track level. Probably not feasible in the real world as a boat might come along, but fortunately one does not in the game.

Cost$7873
Length120m
Materials available Iron, Cable
No. Phases2
Budget$20000
Level designed byChronic Logic
Image of bridge 'Hard 4' Image of bridge 'Hard 4' Image of bridge 'Hard 4'
  • Image of bridge "Hard 4"
  • Image of bridge "Hard 4"
  • Image of bridge "Hard 4"