This is a 360m train drawbridge. It's quite similar in design to the Medium 8 bridge, just with quirkier main towers. Despite it being a 'drawbridge', no hydraulics were provided, so it is built high enough to allow the ship to pass underneath.
| Cost | $41658 | 
| Length | 360m | 
| Materials available | Iron, Steel, Cable, S Cable, Heavy Steel | 
| No. Phases | 2 | 
| Budget | $175000 | 
| Level designed by | Chronic Logic |