Join or sign in):  

Hard 2

A 280m train bridge optimised for cost.

Cost$17991
Length280m
Materials available Iron, Steel, Cable, S Cable, Heavy Steel
No. Phases2
Budget$100000
Level designed byChronic Logic
Image of bridge 'Hard 2' Image of bridge 'Hard 2' Image of bridge 'Hard 2'
  • Image of bridge "Hard 2"
  • Image of bridge "Hard 2"
  • Image of bridge "Hard 2"