Warning: session_start(): open(/var/lib/php/session/sess_ipol1aih67jpctrndvm02k1ps0, O_RDWR) failed: No space left on device (28) in /var/www/html/bridges/connect.php on line 2

Warning: session_start(): Failed to read session data: files (path: /var/lib/php/session) in /var/www/html/bridges/connect.php on line 2
Shastrix.com - Pontifex
Join or sign in):  

Easy 3

This is a simple 80 m train bridge. I have gone quite minimalistic with the design, which I think gives it a pleasing style.

Cost$3151
Length80m
Materials available Iron, Steel
No. Phases2
Wind speed5m/s
Current speed2m/s
Budget$16000
Level designed byChronic Logic
Added on:4th June 2010
Image of bridge 'Easy 3' Image of bridge 'Easy 3' Image of bridge 'Easy 3'
  • Image of bridge "Easy 3"
  • Image of bridge "Easy 3"
  • Image of bridge "Easy 3"