This is a 120 m bridge for trains with asymmetrical mounts. My previous uploaded attempt for this bridge was truly awful - although I have refined that style somewhat since. This is a new, cheaper, approach which uses cables to contain all of the structure beneath the deck.
| Cost | $10340 |
| Length | 120m |
| Materials available | Iron, Cable, Heavy Steel |
| No. Phases | 2 |
| Wind speed | 5m/s |
| Current speed | 2m/s |
| Budget | $35000 |
| Level designed by | Chronic Logic |
| Added on: | 4th June 2010 |