This is a 120 m train drawbridge. I quite like this bridge actually, it is simple, with clean lines, and smooth action, leaving a large channel for the cargo ship.
| Cost | $7283 |
| Length | 120m |
| Materials available | Iron, Steel, Hydraulics |
| No. Phases | 5 |
| Wind speed | 5m/s |
| Current speed | 2m/s |
| Budget | $25000 |
| Level designed by | Chronic Logic |
| Added on: | 4th June 2010 |