This is an 80 m train bridge. I liked the idea of creating a bridge that was not visible from its surroundings, especially considering the number of mounts strongly suggesting the form the bridge should take.
| Cost | $5030 |
| Length | 80m |
| Materials available | Iron, Cable |
| No. Phases | 2 |
| Wind speed | 5m/s |
| Current speed | 2m/s |
| Budget | $15000 |
| Level designed by | Chronic Logic |
| Added on: | 4th June 2010 |