Join or sign in):  

Medium 1

This is a 120 m train bridge. I'm not sure how feasible it is in the real world as the train gets ever so close to those crossbeams...

Cost$5017
Length120m
Materials available Iron, Steel
No. Phases2
Wind speed5m/s
Current speed2m/s
Budget$16000
Level designed byChronic Logic
Image of bridge 'Medium 1' Image of bridge 'Medium 1' Image of bridge 'Medium 1'
  • Image of bridge "Medium 1"
  • Image of bridge "Medium 1"
  • Image of bridge "Medium 1"