Join or sign in):  

Easy 4

This is an 80 m car bridge. I was going for a low profile, but unfortunately had to include a small section under the bridge.

Cost$3883
Length80m
Materials available Iron, Steel
No. Phases1
Wind speed5m/s
Current speed2m/s
Budget$15000
Level designed byChronic Logic
Image of bridge 'Easy 4' Image of bridge 'Easy 4' Image of bridge 'Easy 4'
  • Image of bridge "Easy 4"
  • Image of bridge "Easy 4"
  • Image of bridge "Easy 4"