This is a 160m double train bridge. I wanted to create a bridge with as low a profile manageable, and this was the result. It is rather cheap, but amusingly wobbly as the trains cross it each balancing out the other and preventing collapse. I'd recommend waiting a few seconds before running the trains across this one!
| Cost | $11641 |
| Length | 160m |
| Materials available | Iron, Cable, S Cable, Heavy Steel |
| No. Phases | 1 |
| Wind speed | 5m/s |
| Current speed | 2m/s |
| Budget | $30000 |
| Level designed by | Chronic Logic |