Join or sign in):  

Medium 7

This is a 120 m bridge for trains with asymmetrical mounts. My previous uploaded attempt for this bridge was truly awful - although I have refined that style somewhat since. This is a new, cheaper, approach which uses cables to contain all of the structure beneath the deck.

Cost$10340
Length120m
Materials available Iron, Cable, Heavy Steel
No. Phases2
Wind speed5m/s
Current speed2m/s
Budget$35000
Level designed byChronic Logic
Added on:4th June 2010
Image of bridge 'Medium 7' Image of bridge 'Medium 7' Image of bridge 'Medium 7'
  • Image of bridge "Medium 7"
  • Image of bridge "Medium 7"
  • Image of bridge "Medium 7"