Join or sign in):  

Medium 7

This is a 120m bridge for a train. I'm a fan of slanty towers which support parts of the bridge, and with appropriately spaced foundations on the left-hand side I was able to put a set in here. Because the cables were not strong enough to support the entire bridge, I built a mini-supporting section underneath the right-hand side. The part is perhaps not as elegantly designed as it could be, so I'll probably have a redesign at some point.

Cost$12831
Length120m
Materials available Iron, Cable, Heavy Steel
No. Phases2
Wind speed5m/s
Current speed2m/s
Budget$35000
Level designed byChronic Logic
Image of bridge 'Medium 7' Image of bridge 'Medium 7' Image of bridge 'Medium 7'
  • Image of bridge "Medium 7"
  • Image of bridge "Medium 7"
  • Image of bridge "Medium 7"