Join or sign in):  

Complex 7

This is a 160m train drawbridge. Not really anything special about this one, it opens up asymmetrically with the deck being submerged, allowing the ship to pass through.

Cost$4584
Length160m
Materials available Iron, Steel, Hydraulics
No. Phases5
Wind speed5m/s
Current speed2m/s
Budget$5500
Level designed byChronic Logic
Image of bridge 'Complex 7' Image of bridge 'Complex 7'
  • Image of bridge "Complex 7"
  • Image of bridge "Complex 7"