This is a 160m train drawbridge. Not really anything special about this one, it opens up asymmetrically with the deck being submerged, allowing the ship to pass through.
Cost | $4584 |
Length | 160m |
Materials available | Iron, Steel, Hydraulics |
No. Phases | 5 |
Wind speed | 5m/s |
Current speed | 2m/s |
Budget | $5500 |
Level designed by | Chronic Logic |