Join or sign in):  

Complex 3

This is a 160m double train bridge. I wanted to create a bridge with as low a profile manageable, and this was the result. It is rather cheap, but amusingly wobbly as the trains cross it each balancing out the other and preventing collapse. I'd recommend waiting a few seconds before running the trains across this one!

Cost$11641
Length160m
Materials available Iron, Cable, S Cable, Heavy Steel
No. Phases1
Wind speed5m/s
Current speed2m/s
Budget$30000
Level designed byChronic Logic
Image of bridge 'Complex 3' Image of bridge 'Complex 3' Image of bridge 'Complex 3'
  • Image of bridge "Complex 3"
  • Image of bridge "Complex 3"
  • Image of bridge "Complex 3"