Join or sign in):  

Complex 2

This is a 720m double-lane train bridge. Again, style was perhaps more of a concern than practicality in this instance. The stress isn't uniform across the bridge and the ride across it, if it were ever built, would be rather wobbly with the single row of cables supporting part of the deck.

Cost$63576
Length720m
Materials available Iron, Steel, Cable, S Cable, Heavy Steel
No. Phases1
Wind speed5m/s
Current speed2m/s
Budget$120000
Level designed byChronic Logic
Image of bridge 'Complex 2' Image of bridge 'Complex 2'
  • Image of bridge "Complex 2"
  • Image of bridge "Complex 2"